BOC Dissolved Acetylene Infrastructure Works, Immingham (Waterways)

C Spencer Limited (June 2012 – September 2012)

This project involved the supply and installation of a road bridge over a waterway.  Detailed fabrication drawings were produced and approved; supply of materials, manufacture and painting of the super structure elements; delivery and installation during normal working hours.  The 125 Tonne 32 meter long structure was built up and installed in 4 days onto pre-cast abutments using a number of cranes.